This project featured the use of porcelain in three different applications. The main entry displays a corporate signage wall with porcelain panels surrounded by wood veneer panels. Large-format floor tiles are utilized throughout the reception area and into the kitchen/pantry. The third porcelain feature is the “island” countertop in the middle of the pantry. Another […]
This new child care facility for PHMC is located on the concourse level at 1500 Market Street. The previous occupant at the site was a branch bank which contained a 600 SF vault consisting of 18” thick concrete walls. The vault now contains one of two playground areas with jungle gyms and synthetic turf. The […]
The Cira Centre South project, developed by Brandywine Realty Trust on land leased from the University of Pennsylvania, includes two parts: a northern parcel fronting Chestnut Street which contains an apartment tower, and a southern parcel fronting Walnut Street which features a 49-story mixed-use office and residential tower. The FMC Tower contains a total of […]
This professional basketball training center is composed of two buildings, the practice facility building and an office building which serves as the Philadelphia 76ers’ main office. The practice facility building includes two full-size basketball courts designed as exact replicas of the Wells Fargo Center court. A host of amenities were constructed for the players, coaches, […]
This project was a major renovation to a tax accounting firm on the 7th floor of the United Engineers building, located at 30 S. 17th Street. With a 10-week duration, the timing of the renovation coincided with the height of tax season. It included renovations to the existing reception and kitchen areas, as well as […]
This project included the renovation of the elevator lobby and restrooms within an occupied building. A few of the notable features of the project include the high-end glass toilet partitions, wood plank ceramic tile, state-of-the-art faucets, custom café with beer system, indoor bike rack for the employees, and walls clad with reclaimed wood. The overall […]
Obermayer Rebmann Maxwell & Hippel is a repeat client as INTECH completed their fit-out 20 years ago at Suburban Station in Philadelphia. In August of 2015, Obermayer Rebmann Maxwell & Hippel was looking to relocate their Philadelphia headquarters, and again came to INTECH. We started by providing conceptual budgets for their new facility at 1500 […]
This project was a total renovation and rebranding of an existing Beneficial Bank located at 1600 Chestnut Street. The renovation included modifications to the floor plan, ceiling, soffit. New LED lighting, Millwork, Flooring, Painting, Security, and Data Infrastructure were included to give this branch bank the contemporary look and technological updgrades that the client desired. […]
When Anapol Schwartz made the decision to move from their current office in an old brownstone to the 16th Floor of One Logan Square, they recognized it was going to be a daunting task. They made a key decision to hire CBRE as their Owner’s Representative to guide them through the process. Based upon a […]
The iCore Networks project was a relocation and expansion from the East Tower of Centre Square to the 26th floor of the West Tower of Centre Square (1500 Market Street). The project involved demolition of the existing space, all new partitions and ceilings, and a special glass wall feature. This “Switchlite” glass wall turns the […]