The renovation for the Pond Lehocky Stern Giordano space presented a challenging schedule with many long lead time issues to overcome. The project was spread out over three floors, with two of the upper floors dedicated to the company partners and a lower floor of One Commerce Square for support staff and back-of-office functions. The […]
INTECH completed the renovation of the office space within the occupied workplace of Morgan Lewis in Center City Philadelphia. Part of the work included the selective demolition of finishes and the installation of new Italian marble stone floors throughout the lobby areas and on the countertops of the reception desks. Wallcoverings, new cabinetry, and woodwork […]
Brandywine’s office relocation needed to be performed within less than three months and required demolition of an existing mezzanine area within the occupied building. Other work included marble, millwork, glass partitions, exterior window modifications, wallcoverings/fabric wrapped panels, and open ceilings with MEP modifications. Although the permitting process delayed the project start and there were several […]
Based in West Philadelphia, the University City Science Center is a community of partners committed to technology-based economic development in the greater Philadelphia region. The latest development by Wexford Science + Technology is a 13-story Class A mixed-use laboratory and office building located at 3737 Market Street. The building has a steel frame and composite […]
INTECH competitively budgeted an 8,500 SF space at Two Commerce Square for a law firm that was relocating from Two Liberty Place. Once awarded, INTECH worked closely with Gensler (architect) and the Owner’s Representative out of Kansas City, MO to develop a GMP and maintain it throughout construction, while maintaining the schedule.
The project included laboratory and office fit-out with heavy concentration of owner supplied laboratory equipment and fixtures. The existing space was raw space that required completely new mechanical equipment and ductwork, and electrical systems. Heavy coordination of work with the occupied floor below involving floor coring and plumbing work. As part of the project, INTECH […]
INTECH provided pre-construction and construction services for the façade renovation and retail expansion at 1601 Market Street. The project enlarged the building footprint and included installation of a new curtainwall system on the first and second levels of the building. Exploratory demolition and extensive coordination with the design team during the pre-construction phase helped to […]
The tenant interior fit-out for Grosvenor Fund Management on the second floor of Two Commerce was a fast-paced project, requiring the space to be ready for occupancy within nine weeks of mobilization. Within this short time frame, custom-fabricated millwork incorporating reclaimed wood was built, in addition to a custom Nanawall system manufactured in Germany. This […]
AVID Radiopharmaceuticals has relocated from 3624 Market Street to new office and laboratory space at 3711 Market Street. Construction involved tenant improvements for office space, and specialty areas for a biology lab, hot lab, chemical lab, synthesis lab, and a GMP clean room. Due to the nature of the radioactive materials that are used in […]
Aetna determined that they would restack and consolidate their corporate campus in Blue Bell, PA to accommodate the absorption of personnel located in King of Prussia. The Blue Bell campus consists of four primary buildings totalling 400,000 SF and impacting 3,800 employees. This project involved numerous moves and phased renovations of all buildings to accomplish […]