The Stein Auditorium renovation was performed over the summer, but required close planning and early release of long-lead items during the Pre-Construction Phase to ensure that all materials were delivered on schedule. The work included removing and replacing the existing seating, adding new lights, flooring, and finishes, and A/V Work. By identifying the long-lead items […]
This project involved the demolition of five existing classrooms and construction of two state-of-the-art interactive classrooms on the second floor of the college building. The classrooms were built on raised-access flooring which allows for the frequent wiring and voice data work below the floors necessary for different room functions. The rooms are equipped with interactive […]
Housing the Upper School, Middle School, and Science Center for The Episcopal Academy’s new campus, the Academic Building is a three-story classroom facility for the school’s 6th through 12th grade students. Sited next to the Lower School, and across the Campus Green from the Campus Center, the Academic Building accommodates the diverse needs of a […]
As the academic and social hub for The Episcopal Academy’s youngest students (grades Pre-K through 5th), the new Lower School is a three-story classroom facility that also houses a variety of spaces that are dedicated to early childhood education and development. In addition to 28 classrooms, the building also contains a library, physical education gymnasium, […]
The Campus Center at The Episcopal Academy is one of four new buildings constructed by INTECH in the creation of the college preparatory school’s new campus. At two stories and 80,000 SF, the building is sited to face the central campus green, and also creates an intimate outdoor courtyard between its two primary wings. Housing […]
As the largest building on The Episcopal Academy’s new campus, the Athletic Center brings together under one roof all of the indoor sporting events offered by the school. Fully ADA-compliant throughout, the building is composed of three primary areas – Natatorium, Field House, and Competition Gym – which are linked and supported by associated spaces […]
The Episcopal Academy is an independent college preparatory school. Recognizing the limitations of its original campuses in Merion and Devon and the need to consolidate them into a single location, Episcopal acquired 120 acres in Delaware County, necessitating a masterplan for the new campus. INTECH completed four major buildings on the campus, that opened in […]
The project consisted of renovations to two large Classroom Auditoriums in the Alumni Hall at Thomas Jefferson University. Work on an occupied campus required that one of these auditoriums remain open and in full operation at all times. The Auditoriums were retrofitted, and received the latest technology including fully integrated seating, lighting, and audio visual […]
The Martin Residence Hall is an 8-story residential building which is part of the Thomas Jefferson University Hospital complex in Philadelphia. The building has been renovated on a floor by floor basis over the course of several years. INTECH was responsible for multiple phases beginning in 2009. The first phase involved the conversion of offices […]
INTECH provided Pre-Construction services for the construction of a new, three-story kindergarten through eighth grade charter school of approximately 80,000 square feet. The new school will be located on a six-acre site at the corner of 58th and Whitby Streets in southwest Philadelphia. The initial work includes abatement and demolition of existing buildings and related […]