The new Elmwood Park Zoo animal hospital and welcome center are part of a multi-phase renovation and expansion of the zoo’s 73-acre master campus. The project includes extensive site work and the construction of a new animal hospital, a welcome center with exhibit space, a gift shop, and administrative offices. The animal hospital allows veterinarians […]
This locker room renovation and expansion at the Wells Fargo Center included a new state-of-the-art locker room, training room, team lounge, video room, coaches offices, coaches locker room, coaches work room, as well as a new owner’s lounge. The project was completed in two phases. Phase 1 included the player areas and was completed for […]
Liberty Bell Beer Garden is a new 220-seat indoor/outdoor amenity to the expanding Parx Casino. Stocked with a full bar of local brews, wines, and specialty cocktails, as well as signature dishes from the chefs of the casino’s eateries, Liberty Bell Gastropub and Oliveto, Liberty Bell Beer Garden is an all-season entertainment destination. With a […]
The project includes renovations at five zones, including 13,150 SF of fit-out of an existing core and shell space for a poker room, and 26,450 SF of new construction and fit-out space for a show room. The show room scope also includes 1,700 SF of exterior bus and loading docks with canopies. Additionally, INTECH’s scope […]
The HAJOCA building, once a major manufacturing plant rich with history, was converted to a three-story building for WXPN / World Café Live. It now houses a multi-level, full-service performance theater, sound-proof radio broadcast/recording station, tenant offices, and a café / entertainment lounge. In addition to the complex design and multiple design teams, the rapid […]
The WXPN / World Café Live project is a renovation of existing back-of house space into supplemental support space. The new space will consist of a studio, green room, kitchen expansion, office, and storage rooms.
Adjacent to the University of Pennsylvania campus, The Bridge: Cinema de Lux is a six-theater movie and retail complex with stadium-style seating, state-of-the-art projection rooms and equipment, as well as concession stands and a stylish bar.
CBS3 TV’s relocation to their new home at 1500 Spring Garden Street involved the renovation of a 100,000 SF space on two floors (ground and sixth). New state-of-the-art digital studios, video control rooms, newsroom, and offices comprised this large program. Key construction considerations included raised flooring, a new 600-ton air-cooled chilled water system with waterside […]
Philadelphia Park was selected as one of eight new gaming facilities created under new gaming legislation in 2006. Under an incredibly tight time schedule, INTECH renovated an existing building that was home to an occupied and operational racetrack, as well as constructed an entirely new entrance and porte cochere, all within a six-month time frame. […]
This 12-theatre complex required intensive planning and coordination among the entire project team. Providing customers with a high-quality experience was a primary concern to the owners, so climate control systems were acoustically insulated and projection systems were carefully protected from construction dust.