Fox Chase Cancer Center – Diagnostic Imaging Rooms

For this project, two Diagnostic Imaging (DI) and control rooms were added adjacent to an existing DI. The imaging rooms were located on the first floor, below ground, and are equipped with state-of-the-art technologies. Challenges included Level Four ICRA requirements and a fast-track, inflexible schedule during this four-phased project in an occupied facility.

CHOP Connection at Abington Memorial Hospital

This two-phased renovation project included construction of both patient exam rooms and physician offices. The work area was located directly below the Post-Partum Unit and above the Radiology Department, making dust and noise pollution control primary considerations during all phases of construction.

CHOP Nicholas and Athena Karabots Pediatric Care Center

This Pediatric Care Center offers the highest level of services to the children of West Philadelphia. The facility is able to handle more than 45,000 patient visits per year. It is a core location for CHOP’s medical education programs and community activities. The project included a two-story steel and concrete structure with a masonry, stone, […]

Chestnut Hill Hospital – Lobby Renovation

Renovation of the Main Lobby at Chestnut Hill Hospital upgraded the center of the hospital, connecting a newly constructed hospital wing with the original main hospital building. Because the main lobby links the two main buildings at the hospital, the project required three phases in order to maintain operations and pedestrian flow at the entrance. […]

Albert Einstein Medical Center – Moss Rehab Elkins Park Campus

Moss Rehab is a rehabilitation facility on Einstein’s 30-acre suburban campus in Montgomery County, serving those who have experienced brain injury, stroke, amputation, and other physical disabilities.The project entailed the renovation of the medical office building and base building, including HVAC upgrades. The interiors of the first and third floors of the medical office building […]

Abington Memorial Hospital – Neonatal Intensive Care Unit

The project was phased interior renovation of a neonatal intensive care unit in an occupied facility. Construction included new intensive care patient rooms, nurse call stations, and new finishes. Other modifications to the space included upgrades to the existing electrical and HVAC systems, as well as extensive medical gas work. This project continued INTECH’s long-standing […]

Abington Memorial Hospital – Lenfest Pavilion & Parking Garage

The five-story Lenfest Pavilion was constructed to meet the growing demands of the community. A total of 33 new critical care beds and an additional 25 new maternity rooms were created. New operating rooms with digital, voice-activated equipment were designed to enhance surgical efficiency and improve patient care. Sited on 6.5 acres, the new building […]

Abington Memorial Hospital – Fourth And Fifth Floors Highland Building

Abington Memorial Hospital renovated the fourth and fifth floors of the Highland Building. Both floors were upgraded to include new fire protection and mechanical systems, and the replacement of windows. The fourth floor was converted to a new psychiatric unit with tamper proof and psychiatric risk hardware and accessories. Windows include integral blinds and polycarbonate […]

Abington Memorial Hospital – Cardiac Catheterization Laboratory and Suites

To support the construction of a new cardiac catheterization laboratory, this project included the construction of new exam rooms, support offices, a conference room, staff lounge, and locker room. Features included new HVAC equipment as well as structural modifications to support the new equipment. The challenge of this project was coordinating system shut-downs and service […]

Abington Memorial Hospital – Angiography Suite

Creating space for state-of-the-art diagnostic equipment, the Angiography Suite was designed to include updated support areas for patients and staff. The schedule, managed using the Critical Path Method, was closely monitored to ensure that diagnostic equipment would be installed and commissioned on time.