PNC Bank – Multi-Phased Restack

This project was a multi-phased restack for PNC Bank involving floors four, six, seven, and eight. Renovations to each floor included new offices, pantries, millwork, and finishes, in addition to mechanical and electrical upgrades. Complete renovation of the restrooms on each floor was added to the scope after construction was underway. The eighth floor features […]

Walnut Street Café

Walnut Street Café is a multi-level restaurant with an open kitchen and café bar. The restaurant contains custom finishes throughout, including millwork, structural stair, rails, mezzanine, and lighting. The aggressive 18-week schedule was achieved with the assistance of structural and millwork design assists.

2104-06 Market Street

The project at 2104-06 Market Street was a complete façade replacement on the front and rear elevations of an existing building. The original 1900-era brick façade was shored and completely removed and replaced with new brick, curtainwall, and metal panels. The roof was extended on both elevations and an outdoor terrace was added at the […]

Brandywine Realty Trust – Corporate Headquarters

INTECH constructed the new corporate headquarters fit-out for Brandywine Realty Trust on the 16th and 17th floors of the new FMC Tower at Cira Centre South. The project included the installation of a communicating stairway between the two floors. There were ample challenges due to an aggressive schedule as well as numerous high-end finishes. Material […]

Pennoni

The fit-out for the new Pennoni headquarters presented a challenging schedule with many long-lead items. The project takes up the entire third floor of 1900 Market Street. Several long-lead items, including custom office fronts, required close coordination between subcontractors. Items had to be ordered earlier than normal in the construction process. Other trades that presented […]

Edgewater Apartments

The renovation of the amenities and lobby of the Edgewater Apartments was performed within an operational apartment building. Close coordination with the building’s staff and residents was required to limit disruption and allow the project to be performed safely and within budget. To allow the building to operate properly, this project was performed in three […]

Pyramid Club

The Pyramid Club was an occupied phased renovation of the existing space on the 52nd floor of 1735 Market Street. Since the Club had not been renovated in over 20 years, the goal was to update its appearance to help attract the next generation of Philadelphia’s social and business leaders. The renovation was focused on […]

The Rittenhouse – Lobby

The Rittenhouse lobby renovation was a project that has been discussed for many years. INTECH originally bid the job in 2013, but due to budget issues, it did not move forward until the summer of 2016. Not knowing much of the existing structure and utilities, much of the design could not be confirmed until after […]

Drexel University – Stein Auditorium

The Stein Auditorium renovation was performed over the summer, but required close planning and early release of long-lead items during the Pre-Construction Phase to ensure that all materials were delivered on schedule. The work included removing and replacing the existing seating, adding new lights, flooring, and finishes, and A/V Work. By identifying the long-lead items […]

Vybe Urgent Care

• 1420 Chestnut Street, Philadelphia, PA • 618 Market Street, Philadelphia, PA • 3550 Market Street, Philadelphia, PA • 5828 Market Street, Philadelphia, PA • 5601 N. Broad Street, Philadelphia, PA • 1207 S. Broad Street, Philadelphia, PA • 1500 Spring Garden Street, Philadelphia, PA • 3630 Street Road, Bensalem, PA The projects consist of […]