This two-phased renovation project included construction of both patient exam rooms and physician offices. The work area was located directly below the Post-Partum Unit and above the Radiology Department, making dust and noise pollution control primary considerations during all phases of construction.
Renovation of the Main Lobby at Chestnut Hill Hospital upgraded the center of the hospital, connecting a newly constructed hospital wing with the original main hospital building. Because the main lobby links the two main buildings at the hospital, the project required three phases in order to maintain operations and pedestrian flow at the entrance. […]
Moss Rehab is a rehabilitation facility on Einstein’s 30-acre suburban campus in Montgomery County, serving those who have experienced brain injury, stroke, amputation, and other physical disabilities.The project entailed the renovation of the medical office building and base building, including HVAC upgrades. The interiors of the first and third floors of the medical office building […]
The project was phased interior renovation of a neonatal intensive care unit in an occupied facility. Construction included new intensive care patient rooms, nurse call stations, and new finishes. Other modifications to the space included upgrades to the existing electrical and HVAC systems, as well as extensive medical gas work. This project continued INTECH’s long-standing […]
Abington Memorial Hospital renovated the fourth and fifth floors of the Highland Building. Both floors were upgraded to include new fire protection and mechanical systems, and the replacement of windows. The fourth floor was converted to a new psychiatric unit with tamper proof and psychiatric risk hardware and accessories. Windows include integral blinds and polycarbonate […]
To support the construction of a new cardiac catheterization laboratory, this project included the construction of new exam rooms, support offices, a conference room, staff lounge, and locker room. Features included new HVAC equipment as well as structural modifications to support the new equipment. The challenge of this project was coordinating system shut-downs and service […]
Creating space for state-of-the-art diagnostic equipment, the Angiography Suite was designed to include updated support areas for patients and staff. The schedule, managed using the Critical Path Method, was closely monitored to ensure that diagnostic equipment would be installed and commissioned on time.
The project consisted of renovations to two large Classroom Auditoriums in the Alumni Hall at Thomas Jefferson University. Work on an occupied campus required that one of these auditoriums remain open and in full operation at all times. The Auditoriums were retrofitted, and received the latest technology including fully integrated seating, lighting, and audio visual […]
The Martin Residence Hall is an 8-story residential building which is part of the Thomas Jefferson University Hospital complex in Philadelphia. The building has been renovated on a floor by floor basis over the course of several years. INTECH was responsible for multiple phases beginning in 2009. The first phase involved the conversion of offices […]
The space in the BNY Mellon Center, located at 1735 Market Street, was renovated to provide an impressive amenities floor complete with billiards, long board, bar, and a wine locker. The space also includes huddle areas constructed with reclaimed lumber and sitting areas with gas fireplaces. The large training section includes operable partitions to accommodate […]