INTECH renovated Beneficial’s popular branch on Route 73, while it stayed in operation. A detailed schedule coordinated with the branch managers was developed prior to any work beginning to limit the amount of disruption that would occur during the renovation. Temporary barricades and phasing were required along with all the work being performed off-hours. INTECH […]
The renovation for the Pond Lehocky Stern Giordano space presented a challenging schedule with many long lead time issues to overcome. The project was spread out over three floors, with two of the upper floors dedicated to the company partners and a lower floor of One Commerce Square for support staff and back-of-office functions. The […]
INTECH completed the renovation of the office space within the occupied workplace of Morgan Lewis in Center City Philadelphia. Part of the work included the selective demolition of finishes and the installation of new Italian marble stone floors throughout the lobby areas and on the countertops of the reception desks. Wallcoverings, new cabinetry, and woodwork […]
Brandywine’s office relocation needed to be performed within less than three months and required demolition of an existing mezzanine area within the occupied building. Other work included marble, millwork, glass partitions, exterior window modifications, wallcoverings/fabric wrapped panels, and open ceilings with MEP modifications. Although the permitting process delayed the project start and there were several […]
The National Liberty Museum is located at 321 Chestnut Street. It was founded in 1995 by Irvin J. Borowsky out of a desire to make the world a better place. Located in the heart of historic Philadelphia, adjacent to Independence National Historical Park, the museum is dedicated to preserving America’s heritage of freedom. The museum […]
INTECH competitively budgeted an 8,500 SF space at Two Commerce Square for a law firm that was relocating from Two Liberty Place. Once awarded, INTECH worked closely with Gensler (architect) and the Owner’s Representative out of Kansas City, MO to develop a GMP and maintain it throughout construction, while maintaining the schedule.
The project included laboratory and office fit-out with heavy concentration of owner supplied laboratory equipment and fixtures. The existing space was raw space that required completely new mechanical equipment and ductwork, and electrical systems. Heavy coordination of work with the occupied floor below involving floor coring and plumbing work. As part of the project, INTECH […]
The tenant interior fit-out for Grosvenor Fund Management on the second floor of Two Commerce was a fast-paced project, requiring the space to be ready for occupancy within nine weeks of mobilization. Within this short time frame, custom-fabricated millwork incorporating reclaimed wood was built, in addition to a custom Nanawall system manufactured in Germany. This […]
INTECH fitted out a Mindworks retail store located in the E Terminal at the Philadelphia International Airport for Stellar Partners. The project took place in an active airport terminal within the security perimeter. The space was fitted out with all new flooring, painting, lighting, metal finishes, and casework. INTECH self-performed significant portions of the work […]
AVID Radiopharmaceuticals has relocated from 3624 Market Street to new office and laboratory space at 3711 Market Street. Construction involved tenant improvements for office space, and specialty areas for a biology lab, hot lab, chemical lab, synthesis lab, and a GMP clean room. Due to the nature of the radioactive materials that are used in […]