Renovation of the Main Lobby at Chestnut Hill Hospital upgraded the center of the hospital, connecting a newly constructed hospital wing with the original main hospital building. Because the main lobby links the two main buildings at the hospital, the project required three phases in order to maintain operations and pedestrian flow at the entrance. During each phase, dust control measures were taken to maintain ICRA guidelines, and noise and vibration levels were carefully controlled.
Size: | 4,000 SF |
---|---|
Client: | Chestnut Hill Health Systems |